Do I need RRP certification for this job?

Answer with the building, the person paying for the work, and the square feet. The checker applies the federal coverage test, then names the office that certifies the firm in the state you picked. It does not store what you type.

Choose a state. The result uses the federal coverage test, then names that state's certifying office. Enter the square feet before you trust a minor-repair answer. A blank area is not a measurement.

What the checker is willing to decide

EPA's contractor page draws the first line at 1978. Housing built that year or later is outside the renovation rule. So is housing set aside for elderly or disabled residents, and so is a zero-bedroom dwelling such as a studio or a dorm, unless a child under six lives there or is expected to. A homeowner who is only working on a home they live in, and do not rent, is generally outside the rule. The same page, and the program overview, pull that homeowner back in if they rent any part of the home, run child care in it, or buy it to renovate and sell.

Paid work that disturbs paint in pre-1978 target housing or in a child-occupied facility is the covered case. The child-occupied facility test is the one in 40 CFR 745.83: the same child under 6, on at least two days in a week, at least 3 hours each of those days, at least 6 hours combined that week, and at least 60 hours a year. A daycare that does not meet the hours is not a child-occupied facility just because children are sometimes in the building.

The square-foot exception, and the things that cancel it

Minor repair and maintenance is 6 square feet or less of painted surface per room indoors, or 20 square feet or less outdoors, and only when the job does not replace a window, does not demolish a painted surface, and does not use a practice prohibited by 40 CFR 745.85(a)(3). EPA's questions page uses torch burning as the example of a practice that cannot hide inside the square-foot exception. Jobs in the same room within 30 days are one job for the count, except emergency renovations. When a painted piece is removed, the whole surface of that piece is what you measure, not the strip you sanded.

Paint testing is optional. Unless someone qualified has documented that the paint is not lead-based, the rule still applies. A certified renovator may use an EPA-recognized test kit or paint-chip samples sent to an EPA-recognized lab. An inspector or risk assessor may use an X-ray fluorescence instrument. The checker treats a lead-free determination as a documented fact you already have, not as a suggestion to skip the work practices.

Where the state comes in

Fifteen states run the program instead of EPA. In those states the checker names the state office and links the page where the fee and the training clock are written from the official source. Everywhere else, including the District of Columbia, the firm files with EPA: $300 for 5 years. The checker does not invent a state fee for an EPA state, and it does not treat a state add-on we could not verify as if it changed the square-foot line. Georgia's older summary uses slightly different words for a six-year-old child. That note appears on the Georgia page, not as a second hidden threshold in the math.

If the result says the job is covered, the next pages are the fee comparison, the date calculator, and the checklist you can print for the site. The landlord guide walks through the same rule without the form.

Sources

  1. EPA, Renovation, Repair and Painting Program: Firm Certification
  2. EPA, Renovation, Repair and Painting Program: Renovator Training
  3. EPA, Lead Renovation, Repair and Painting Program
  4. EPA, Renovation, Repair and Painting Program: Contractors
  5. EPA, Frequent Questions About Renovations Covered by the RRP Rule
  6. 40 CFR 745.83, Definitions (eCFR)